The Block Island 30 MW offshore wind farm is fully constructed according to the CEO of Deepwater Wind. It features five GE Haliade 150-6MW Class 1-B offshore wind turbines. The hub height is 100m and rotor diameter is 150m. The wind farm is scheduled to be commissioned by end of this year.