Grid Integration of Wind Power with Energy Storage

Client: IPDP and Macquarie Bank

  • Grid Integration study for integration of 30 MW of wind in two phases, 15 MW each in 2018 and 2019
  • Wind with Energy Storage
  • Transient Stability Analysis
  • Ramping analysis

The objectives are to determine the beneficial impact of energy storage in the integration of wind project into the grid.