Development of West Timor Wind Power

Client name: 
Asian Development Bank
Start date: 
August 2015
End date: 
February 2016
Description: 

Objective and Purpose of the Assignment is to study the impact of the proposed West Timor Wind Farm on the existing power system.  Power systems analysis will be conducted using DigSILENT's PowerFactory.

Deliverables: 
  1. Power flow analysis
  2. Short-circuit analysis
  3. Transient stability analysis
  4. Enhancements to the system to ensure safe and reliable integration of wind