Large Load Interconnection Regulatory Tracker

IWE tracks filings on large-load and data-center interconnection from:

  • Federal: FERC, NERC and DOE
  • Grid operators: PJM, ERCOT, MISO, SPP, CAISO, NYISO and ISO-NE
  • Federal power agencies: Bonneville Power Administration (BPA) and Tennessee Valley Authority (TVA)
  • State commissions:
    • Texas and California
    • the Southeast: Georgia, North Carolina, South Carolina, Florida and Louisiana
    • the West: Oregon, Utah and Arizona

Topics include co-location, cost allocation, flexible load, bring-your-own-generation, NERC reliability studies and FERC’s show-cause proceedings. The tracker is an MCP server, a standard connector that lets AI assistants search these filings, read them, and cite their sources. It also includes three reference tables maintained by IWE:

  • a side-by-side comparison of large-load rules by region
  • a national table of utility large-load tariffs
  • major data-center power deals and how regulators treated them

Connector URL: https://large-load-interconnection-mcp.iwe-ai.com/mcp (to configure see instructions below)

Connect in Claude

  • Click your name in the bottom-left corner, then Settings → Connectors → Add custom connector.
  • Name: Large Load Interconnection Regulatory Tracker
  • URL: https://large-load-interconnection-mcp.iwe-ai.com/mcp
  • Authentication: No sign-in
  • The tools are read-only, so you can set them to “Always allow” to skip the approval prompt on each search.

What you can ask

  • What is the status of the PJM co-location proceeding EL25-49?
  • How do PJM, ERCOT and the Southeast differ on large-load interconnection rules?
  • What are the minimum-bill and contract terms in large-load tariffs in Ohio and Virginia?
  • What did Utah approve for Rocky Mountain Power’s large-load contract?
  • What deadlines are coming up for ERCOT’s large-load rules?
  • What studies does NERC require before a data center connects?
  • What was filed in the last 30 days?
  • Which data center power deals were rejected or restructured, and why?

What the assistant can do

ToolWhat it does
search_filingsFinds filings by keyword, body, region, docket or date. It can also list the newest filings and upcoming comment, intervention and compliance deadlines.
get_filingOpens one filing with its summary and source link. Ask a question to get the exact passages that answer it.
docket_timelineShows the history of a docket, or lists all tracked dockets
compare_rulesCompares large-load rules across PJM, Dominion, ERCOT, SPP, MISO, CAISO, NYISO, ISO-NE, the Southeast and the West: size threshold, study process, flexible service, cost allocation, financial security, bring-your-own-generation, the state’s role, status and next dates.
large_load_tariffsLists about 70 utility large-load tariffs across 39 states: size threshold, minimum demand, contract term, ramp, exit fee, collateral, docket and approval status.
dealsLists major data-center power deals and how regulators treated them, including NIPSCO–Amazon, Talen–Amazon, Crane, Entergy–Meta and Duane Arnold. For each it gives the parties, size, term, how the load is supplied, the regulatory outcome, key terms, lessons and dockets.
search, fetchA simplified search-and-read pair used by ChatGPT Deep Research

Answers in plain language

Answers are written for data-center developers and investors rather than regulatory specialists. Each filing summary opens with what the filing means for a project. Acronyms are spelled out the first time they appear, and each result includes a short glossary of the terms it uses. Ask for exact wording when you need the filing’s own text.

The connector is read-only and needs no sign-in. Filing summaries are machine-generated from public filings. The three reference tables are compiled by IWE from the cited orders and from public compilations by EEI, Lawrence Berkeley National Laboratory and Juncture Policy, and are updated as rules change. Each answer cites its sources, and the content should be verified before it is relied on. This is not legal advice.

Connect in Claude Code

claude mcp add --transport http large-load-tracker https://large-load-interconnection-mcp.iwe-ai.com/mcp

Connect in ChatGPT

You need a paid ChatGPT plan: Plus, Pro, Business, Enterprise or Edu. On Business, Enterprise and Edu plans, an admin may need to turn on connectors first.

  1. Open Settings → Apps & Connectors → Advanced settings, and turn on Developer mode.
  2. Go back to Apps & Connectors and click Create.
  3. Name: Large Load Interconnection Regulatory Tracker
  4. Description: Searches FERC, NERC, DOE, grid operator and state commission filings on large-load and data-center interconnection.
  5. MCP Server URL: https://large-load-interconnection-mcp.iwe-ai.com/mcp
  6. Authentication: No authentication
  7. Confirm that you trust the app, then click Create.

In a new chat, open the + menu (or Developer mode) and select Large Load Interconnection Regulatory Tracker. Ask your question and name the tracker if ChatGPT doesn’t use it on its own. All the tools only read, so ChatGPT won’t ask you to confirm any actions.