Land requirement for RE projects

Following are general rule of thumb for RE projects:

1.  Utility scale wind projects:  7.5 to 10 MW per Sq. Km.

2.  Utility scale solar PV projects:  30MW per Sq. Km.

For wind projects a lot depends on terrain and size of turbine--rotor size and MW rating.